< Back

Melter Costs and Savings by Plant - Advanced Products Division

(In $ Millions—over an 8-year period)
LCD GLASS
(Santa Clara, CA)
New Installation Modifications to Existing Melters
New Gas Furnace All-Elec. Melter 100% Oxy Melter Oxygen Boosting Electric Boosting
Acquisition Costs 8.0 5.5 7.0 1.5 1.0
Pollution Control (Savings) (1.6) (1.0) (1.02) (1.1)
Energy Penalty 4.2 2.0 1.55 3.1
Net Cost   8.0 8.1 8.0 2.03 3.0

NOTE: LCD Glass is the only plant in this division that uses melters.