Melter Costs and Savings by Plant - Commercial Glass Division
(In $ Millions—over an 8-year period)
LIGHTING PRODUCTS
(Joplin, MO)
New Installation
Modifications to Existing Melters
New Gas Furnace
All-Elec. Melter
100% Oxy Melter
Oxygen Boosting
Electric Boosting
Acquisition Costs
30.4
20.9
26.6
5.7
3.8
Pollution Control (Savings)
—
(6.08)
(3.8)
(3.88)
(4.18)
Energy Penalty
—
15.96
7.6
5.89
11.78
Net Cost
30.4
30.78
30.4
7.71
11.4
FLAT GLASS
(Cairo, IL)
New Installation
Modifications to Existing Melters
New Gas Furnace
All-Elec. Melter
100% Oxy Melter
Oxygen Boosting
Electric Boosting
Acquisition Costs
45.6
31.4
39.9
8.55
5.7
Pollution Control (Savings)
—
(9.12)
(5.7)
(5.81)
(6.27)
Energy Penalty
—
23.94
11.4
8.84
17.67
Net Cost
45.6
46.22
45.6
11.58
17.1
(Joplin, MO)
(Cairo, IL)