< Back
Melter Costs and Savings by Plant - Corporate
(In $ Millions—over an 8-year period)
New Installation
Modifications to Existing Melters
New Gas Furnace
All-Elec. Melter
100% Oxy Melter
Oxygen Boosting
Electric Boosting
Acquisition Costs
134.0
92.2
117.3
25.12
16.75
Pollution Control (Savings)
—
(26.8)
(16.8)
(17.08)
(18.43)
Energy Penalty
—
20.4
33.5
25.96
51.24
Net Cost
134.0
85.8
134.0
34.00
49.56