Melter Costs and Savings by Plant - Industrial Glass Division
(In $ Millions—over an 8-year period)
AUTO GLASS
(Findlay, OH)
New Installation
Modifications to
Existing Melters
New Gas Furnace
All-Elec. Melter
100% Oxy Melter
Oxygen Boosting
Electric Boosting
Acquisition Costs
25.0
20.0
22.0
4.75
3.25
Pollution Control (Savings)
—
(4.00)
(3.2)
(3.19)
(3.44)
Energy Penalty
—
13.1
6.3
4.85
9.7
Net Cost
25.0
29.1
25.1
6.41
9.51
GLASS PIPING
(Lynchburg, VA)
New Installation
Modifications to
Existing Melters
New Gas Furnace
All-Elec. Melter
100% Oxy Melter
Oxygen Boosting
Electric Boosting
Acquisition Costs
15.0
10.3
13.1
2.82
1.88
Pollution Control (Savings)
—
(2.4)
(1.9)
(1.92)
(2.06)
Energy Penalty
—
7.9
3.8
2.91
5.81
Net Cost
15.0
15.8
15.0
3.81
5.63
SPECIALTY GLASS
(Towson, MD)
New Installation
Modifications to
Existing Melters
New Gas Furnace
All-Elec. Melter
100% Oxy Melter
Oxygen Boosting
Electric Boosting
Acquisition Costs
10.0
6.8
8.8
1.88
1.25
Pollution Control (Savings)
—
(2.0)
(1.2)
(1.28)
(1.38)
Energy Penalty
—
5.25
2.5
1.94
3.88
Net Cost
10.0
10.05
10.1
2.54
3.75
ALANBROOKE GLASSWORKS
(Birkerhead, England)
New Installation
Modifications to
Existing Melters
New Gas Furnace
All-Elec. Melter
100% Oxy Melter
Oxygen Boosting
Electric Boosting
Acquisition Costs
18.0
12.2
15.8
3.38
2.25
Pollution Control (Savings)
—
(3.6)
(2.2)
(2.32)
(2.48)
Energy Penalty
—
9.5
4.5
3.49
6.98
Net Cost
18.0
18.1
18.1
4.55
6.75
(Findlay, OH)
Existing Melters
(Lynchburg, VA)
Existing Melters
(Towson, MD)
Existing Melters
(Birkerhead, England)
Existing Melters