Melter Costs and Savings by Plant - Industrial Glass Division

(In $ Millions—over an 8-year period)
AUTO GLASS
(Findlay, OH)
New Installation Modifications to
Existing Melters
New Gas Furnace All-Elec. Melter 100% Oxy Melter Oxygen Boosting Electric Boosting
Acquisition Costs 25.0 20.0 22.0 4.75 3.25
Pollution Control (Savings) (4.00) (3.2) (3.19) (3.44)
Energy Penalty 13.1 6.3 4.85 9.7
Net Cost   25.0 29.1 25.1 6.41 9.51

GLASS PIPING
(Lynchburg, VA)
New Installation Modifications to
Existing Melters
New Gas Furnace All-Elec. Melter 100% Oxy Melter Oxygen Boosting Electric Boosting
Acquisition Costs 15.0 10.3 13.1 2.82 1.88
Pollution Control (Savings) (2.4) (1.9) (1.92) (2.06)
Energy Penalty 7.9 3.8 2.91 5.81
Net Cost   15.0 15.8 15.0 3.81 5.63

SPECIALTY GLASS
(Towson, MD)
New Installation Modifications to
Existing Melters
New Gas Furnace All-Elec. Melter 100% Oxy Melter Oxygen Boosting Electric Boosting
Acquisition Costs 10.0 6.8 8.8 1.88 1.25
Pollution Control (Savings) (2.0) (1.2) (1.28) (1.38)
Energy Penalty 5.25 2.5 1.94 3.88
Net Cost   10.0 10.05 10.1 2.54 3.75

ALANBROOKE GLASSWORKS
(Birkerhead, England)
New Installation Modifications to
Existing Melters
New Gas Furnace All-Elec. Melter 100% Oxy Melter Oxygen Boosting Electric Boosting
Acquisition Costs 18.0 12.2 15.8 3.38 2.25
Pollution Control (Savings) (3.6) (2.2) (2.32) (2.48)
Energy Penalty 9.5 4.5 3.49 6.98
Net Cost   18.0 18.1 18.1 4.55 6.75